BEARING UC 205 16J (FYH)
GI WELDING MACHINE 220V
GI V - BELT A - 27
GI RED OXIDE PRIMER (4 LTR)
GI MTA BRASS - CPVC FITTING 20X15MM 3/4 X 1/2
GI MOTOR PULLEY 130 X 2A X 38
GI PLASTIC FTA 1"
GI SUPPLYING, INSTALLATION ,TESTING & COMMISSIONING OF 350 TR(1312500 KCALS PER HR) CAPACITY INDUCED DRAFT COOLING TOWER, WHILE OPERATING AT 28°C AMBIENT WB TEMPERATURE.THE COOLING TOWER MUST BE SIZED FOR HANDLING 312.5 CUBIC METRES PER HOUR WATER FLOW AT A TEMPERATURE DIFFERENCE OF 4.2°C.
GI PRESSURE GAUGE 0 - 800 PSI
GI SC CABLE GLAND 19 MM
GI ELBOW 80MM 90 DEG
© 2020 STC Associate. All rights reserved | Design by @Punisher aka King117